Ghart Construction provided mechanical and piping installation services for a plant upgrade project in Tema, including pressure vessel installation and alignment, process piping fabrication and installation, utility connections, and pre-commissioning including hydrostatic testing and leak testing.
All piping work was executed to ASME B31.3 with full documentation including weld logs, NDT reports, and pressure test records for client and regulatory review.